STUDENT PROJECTS UNDERGRADUATE PROGRAM
FINAL YEAR PROJECTS 2014-15 |
Sr. No. |
Title of Project |
Supervisor |
1. |
Effect
of relaxation and backwashing on membrane fouling in Submerged
Membrane Bioreactor |
Engr. M. Bilal Asif |
2. |
Performance
evaluation of Hybrid Submerged Membrane Bioreactor |
3. |
Performance
evaluation of Capacitive Deionization System for desalination |
4. |
Treatment
Potential of HFRF for the treatment of Textile Wastewater
using Different Media |
Engr. Sidra Iftekhar |
5. |
Dam
Water Conservation using monolayer Polymers |
6. |
Removal
of heavy metals using Natural Absorbents |
7. |
Production
of Methane using anaerobic attach growth process |
Engr. Shamas Tabraiz |
8. |
Hybrid
Aerobic Attached & Suspended Growth Wastewater Treatment
Plant |
9. |
Performance
evaluation of Membrane Bioreactor for the treatment of Textile
effluent |
10. |
Cultivation
of Granular sludge for the treatment of Domestic Wastewater |
Engr. Rasikh Habib |
11. |
Effect
of coagulant (Alum) addition on the performance of Sequencing
Batch Reactor |
12. |
Treatment
of wastewater using Nanofiltration for resue |
Engr. Sadia Fida |
|